Basic information about Orange Line Metro Train
Orange Line Metro Train Basics Orange Line Metro Train(OLMT) is the first transport project under CPEC and it is the first Electricity-run public sector transport project Agreements and Completion The agreement for this project was signed in April 2015 and completed on October 9, 2020. The project has been completed in five and a half year as opposed to the planned two year One side fare The government fixed one side fare of Rs. 40 for first 6 month of period and seeks to increase it stage by stage. But most importantly, Punjab Government bearing Rs. 130 per passenger and per trip to run this project. Train Info 27 train sets at the start of operation Each train consist on 5 cars Train is operating with 80km/h(50mph) speed Track start at Ali Town station and end at Dera Gujran Station. There are 26 stations in which 24 are elevated and 2 stations are underground Total line track length 27.1 km(16.8 mi) Expected to handle 250,000 pas...